| Conflict | WW II (1939-45) |
|---|---|
| Original/Reproduction | Original |
| Theme | Militaria |
| Region of Origin | United States |
| Country of Origin | United States |
Check the listing for details. 5 US Army Air Forces Flight Time Distance Computer Altitude Correction Air. Condition: Used, Made in United States. Listed at 155.00 USD. The product is an original US Army Air Forces Flight Time Distance Computer from World War II, made in the United States. This militaria collectible item is a valuable piece of history that represents the era of the war. The distance computer would have been used to accurately calculate flight times, distances, and altitudes, providing crucial information for military operations during that time. Its design and functionality reflect the innovative technology and precision of the US Army Air Forces during World War II. Lot of 5