| Size | B5 |
|---|---|
| Ruling Type | Dotted |
| Sheet Size | 7-x-10-inch |
| Color | Green |
| Manufacturer Part Number | Meetingnotebook |
| Material Type | Paper |
| Ruling | Dotted |
| Material | Plastic |
| Item Length | 10.35 |
| Product Dimensions | 10.35 x 7.09 x 0.59 inches |
| Brand | Alltree |
| Department | Office Supplies |
| Item Height | 0.59 |
| Cover Material | Plastic |
| Style | Modern |
| Theme | Book |
| Number of Items | 1 |
| Item Width | 7.09 |
| Item Weight | 15.5 ounces |
Check the listing for details. Alltree Meeting Notebook For Work. Project Planner Notebook. New In Plastic.. Color: Green, Condition: New with tags. Listed at 17.90 USD. Alltree Meeting Notebook For Work. Project Planner Notebook. New In Plastic.