Brand Unbranded
Manufacturer Part Number Dose Not Apply

Check the listing for details. Car GPS Tracker Magnetic Waterproof Tracking Device with App Real Time Location. Condition: New. Listed at 18.46 USD. The magnetic shell is waterproof and rainproof, built-in strong magnet, can be firmly attached to the vehicle, will not fall off easily. Keep a close eye on the safety of your children and elderly or property with her.

$12.92
$18.46